Lewati ke konten utama / Skip to main content

Construction calculator

Cast Concrete & Batch Mix Calculator

Determine wet concrete volume and required cement, sand, and gravel quantities from target mix ratios. Enter your project measurements below.

Free

All calculations are private and save locally in your browser.

01

Dimensions & Specs

Enter dimensions

02

Instant estimation

Required materials

Wet pour volume

1.2 m³

Portland cement

12 bags

Concrete sand

0.65 m³

Crushed gravel

0.97 m³

Uses a 1.54 dry materials factor to account for particle packing. Always follow structural engineering specifications for load-bearing slabs.

Compare options

Scenario comparison

Save up to three input combinations and compare their results. Scenarios stay in this browser.

Change the inputs, then save your first scenario to start comparing.

Quick guide

How to interpret results.

Calculates wet casting volume (L × W × H), applies a 1.54 dry materials factor to account for void consolidation, and breaks down cement sacks, sand m³, and gravel m³.

  1. 01

    Input structure length, width, and casting depth/thickness in meters.

  2. 02

    Select concrete nominal mix ratio (e.g. 1:2:3 for general structural elements).

  3. 03

    Input cement bag weight (40 kg or 50 kg) to obtain purchase bag counts.

Engineering considerations

  • A 1:2:3 volumetric ratio corresponds approximately to K-175 to K-225 site-mixed concrete.
  • Structural elements (slabs, columns, footings) must follow formal structural engineering designs.
  • Water-cement ratio (0.5–0.55) must be controlled carefully to prevent weak concrete.

Frequently asked questions

Answers to common questions.

What is the 1.54 factor?

When cement, sand, gravel, and water are mixed, smaller particles fill the voids between stones. 1 m³ of wet concrete requires 1.54 m³ of loose dry materials.

What does a 1:2:3 mix ratio mean?

1 volume part Portland cement, 2 volume parts coarse sand, and 3 volume parts clean crushed stone/gravel.

When should ready-mix concrete be ordered instead?

For pours exceeding 4 to 5 m³, ready-mix batching trucks ensure uniform quality and eliminate exhausting site mixing.