Lewati ke konten utama / Skip to main content

Construction calculator

Earthwork & Soil Excavation Calculator

Estimate trench excavation volume, loosened spoil volume, total tonnage, and disposal truck trips. Enter your project measurements below.

Free

All calculations are private and save locally in your browser.

01

Dimensions & Specs

Enter dimensions

02

Instant estimation

Required materials

Loosened spoil volume

37.5 m³

Geometric cut volume

30 m³

Disposal truck loads

10 trips

Total spoil weight

52.5 tons

Excavated earth swells as void spaces expand. Trenches deeper than 1.5m require shoring precautions.

Compare options

Scenario comparison

Save up to three input combinations and compare their results. Scenarios stay in this browser.

Change the inputs, then save your first scenario to start comparing.

Quick guide

How to interpret results.

Computes geometric trench volume (L × W × Depth), applies an excavation swell/bulking factor (20–30%), and calculates haulage truck loads required to remove spoil off-site.

  1. 01

    Input excavation length, width, and trench depth in meters.

  2. 02

    Specify the swell/bulking factor for your soil type (default 25%).

  3. 03

    Enter disposal truck volume to determine haulage round trips.

Engineering considerations

  • Undisturbed earth swells when dug up due to loosened particle void structures.
  • Trench sides deeper than 1.5 meters require shoring or stepped battering to prevent collapse.
  • Set aside reusable topsoil or backfill material on site to avoid purchasing replacement fill later.

Frequently asked questions

Answers to common questions.

What is soil swell/bulking?

Excavated earth occupies more volume in a truck than it did in the ground because digging introduces air between particles.

What swell factor should I use?

Clay soils swell by 20–30%, sandy loams by 15–20%, and blasted hard rock can swell by 40–50%.

How is deep trench safety managed?

Step back trenches at a 45° angle or install timber/hydraulic shoring boxes for any excavation over 1.2 meters deep.