Construction calculator

Renovation Labor Cost Calculator

Compare daily wages against lump-sum piece-rate contractor quotes based on area, crew size, and duration. Enter your project measurements below.

Free

All calculations are private and save locally in your browser.

01

Dimensions & Specs

Enter dimensions

02

Instant estimation

Required materials

Lower cost estimate

Rp 3,795,000

Cheaper contracting method

Daily wages

Daily wages total

Rp 3,795,000

Contract rate total

Rp 4,565,000

Difference

Rp 770,000

Total labor effort

15 person-days

Daily rate / m²

Rp 63,250

Piece rate / m²

Rp 76,083

Comparison is only equivalent when both methods cover identical scopes of work. Daily wages require active supervision.

Compare options

Scenario comparison

Save up to three input combinations and compare their results. Scenarios stay in this browser.

Change the inputs, then save your first scenario to start comparing.

Quick guide

How to interpret results.

Compares cumulative daily labor (crew size × daily wage × duration + allowances + equipment) against lump-sum piece-rate contractor quotes across the same scope of work.

  1. 01

    Input work area in square meters and anticipated duration in working days.

  2. 02

    Enter daily crew headcount, wages, allowances, and site equipment expenses.

  3. 03

    Input contractor piece-rate per m² and mobilization fees to compare side-by-side.

Engineering considerations

  • Comparison is valid only when both methods encompass identical scopes and tool provisions.
  • Daily wages require active site supervision; piece-rate transfers productivity risk to the contractor.
  • The lowest estimate is not always best—quality, workmanship warranty, and speed are critical.

Frequently asked questions

Answers to common questions.

When is daily wage preferable?

For detailed renovations, artistic finishes, or undefined exploratory repairs where scope cannot be quantified upfront.

When is piece-rate preferable?

For large, repetitive, measurable tasks (e.g. 200 m² of plastering or tiling) where cost certainty is paramount.

Does piece-rate include materials?

Contractor piece-rate quotes typically cover labor only ('upah kerja'). Always confirm whether consumables are included.